-
FloodSAFE
- Special Projects
- Subventions
- North Delta
- West Delta
- DKIP
- DRMS
- GIS
Environmental Stewardship and Statewide Resources Office
Levees and Environmental Engineering
Delta Risk Management Strategy
Location:
1416 9th Street, Room 1601
Sacramento, CA 95814
Mailing Address:
P.O. Box 942836
Sacramento, CA 94236-0001
Phase 1 Information
Phase 1 evaluated the risk and consequences to the State (e.g., water export disruption and economic impact) and the Delta (e.g., levees, infrastructure, property, and ecosystem) associated with the failure of Delta levees and other assets considering their exposure to all hazards (seismic, flood, subsidence, seepage and sea level rise, etc.) under present as well as foreseeable future conditions. The evaluation assesses the total risk as well as a disaggregation of the risk for individual islands. The DRMS Phase 1 Executive Summary (PDF: 1.9MB) presents the key findings from the Phase 1 Report.
The Phase 1 Report has been favorably reviewed by an Independent Review Panel (IRP) comprised of technical experts. The IRP members were selected by the CALFED Independent Science Board (ISB). The review, including comments and responses, is available in Appendices A&B of the DRMS Phase 1 Report.
- Final Phase 1 Report
2009- Low Resolution (PDF: 1.9MB)
- Medium Resolution (PDF: 24MB)
- Risk Report: Section 0 (PDF: 71KB) - Preamble, Perpective, Table of Contents, Definition of Terms
- Risk Report: Section 1 * (PDF: 399KB) - Introduction
- Risk Report: Section 2 * (PDF: 13.9MB)- Sacramento/San Joaquin Delta and Suisun Marsh
- Risk Report: Section 3 (PDF: 48KB)- DRMS Risk Analysis Scope
- Risk Report: Section 4 (PDF: 485KB)- Risk Analysis Methodology
- Risk Report: Section 5 * (PDF: 13.6MB)- 2005 State of the State and the Delta
- Risk Report: Section 6 * (PDF: 20.7MB)- Seismic Risk Analysis
- Risk Report: Section 7 * (PDF: 10.4MB)- Flood Risk Analysis
- Risk Report: Section 8 (PDF: 1MB)- Wind and Wave Risk Analysis
- Risk Report: Section 9 * (PDF: 718KB)- Sunny-Day Risk Analysis
- Risk Report: Section 10 (PDF: 102KB)- Responding to Levee Breaches
- Risk Report: Section 11 (PDF: 2.3MB)- Salinity Impacts
- Risk Report: Section 12 (PDF: 6.5MB)- Consequences Modeling
- Risk Report: Section 13 * (PDF: 4.4MB)- Risk Analysis 2005 Base Year Results
- Risk Report: Section 14 (PDF: 525KB)- Risk Analysis for Future Years
- Risk Report: Section 15 (PDF: 33KB)- Assumptions and Limitations
- Risk Report: Section 16 * (PDF: 181KB)- References
- Risk Report: Appendix A (PDF: 4.6MB)
- Comments of the Steering Committee Members and Member Agencies on the April 24, 2007, Draft of the Risk Analysis Report and the Technical Memoranda (Various Dates) and the Responses of the Consulting Team
- Risk Report: Appendix B (PDF: 3.5MB)
- Comments of the Independent Review Panel on the June 26, 2007, Draft of the Risk Analysis Report and the Responses of the Consulting Team and Comments of the Independent Review Panel on the July 2008 Draft of the Risk Analysis Report
* Updated December 2009
Posted - March 2009
Executive Summary
- Draft Phase 1 Report
2007- Phase
1 Risk Analysis : Summary Report Draft (PDF:
1.58MB)
- Delta Risk Managament Strategy (DRMS), June 26, 2007
- Risk
Analysis Draft : Cover and Table of Contents (PDF:
85.9KB)
- Delta Risk Management Strategy (DRMS), June 26, 2007
- Risk
Analysis Draft : Sections 1, 2, 3, and 4 (PDF:
3.86MB)
- Introduction, Sacramento/San Joaquin Delta and Suisun Marsh, Risk Analysis Scope and Methodolgy, Delta Risk Management Strategy (DRMS), June 26, 2007
Risk Analysis Draft: Section 5 (Pending Review)
- Risk
Analysis Draft : Section 6 (PDF: 3.32MB)
- Seismic Risk Analysis, Delta Risk Management Strategy (DRMS), June 26, 2007
- Risk
Analysis Draft : Section 6 (PDF: 4.75MB)
- Maps, Charts, and Graphs, Delta Risk Management Strategy (DRMS), June 26, 2007
- Risk
Analysis Draft : Section 7 (PDF: 4.99MB)
- Flood Risk Analysis, Delta Risk Management Strategy (DRMS), June 26, 2007
- Risk
Analysis Draft : Sections 8, 9, 10, and 11 (PDF:
3.61MB)
- Wind and Wave Risk Analysis, Sunny Day High Tide Risk Analysis, Responding to Levee Breaches, and Salinity Impacts, Delta Risk Management Strategy (DRMS), June 26, 2007
- Risk
Analysis Draft : Section 12 (PDF: 895KB)
- Consequences Modeling, Delta Risk Management Strategy (DRMS), June 26, 2007
- Risk
Analysis Draft : Section 13, File 1 (PDF: 6.32MB)
- Risk Analysis 2005 Base Year Results, Delta Risk Management Strategy (DRMS), June 26, 2007
- Risk
Analysis Draft : Section 13, File 2 (PDF: 5.11MB)
- Maps, charts and graphs, Delta Risk Management Strategy (DRMS), June 26, 2007
- Risk
Analysis Draft : Sections 14, 15, and 16 (PDF:
392KB)
- Future Risk Analysis, Assumptions and Limitations, and References, Delta Risk Management Strategy (DRMS), June 28, 2007
- Review of the Delta Risk Management Strategy Report (DRMS), Phase 1 (PDF: 505KB), August 23, 2007
- Phase
1 Risk Analysis : Summary Report Draft (PDF:
1.58MB)
- IRP
Review Information
2008- Dahm Cover Letter for DRMS Review (PDF: 239KB), October 21, 2008
- IRP DRMS Review (main plus appendices) (PDF: 2MB), October 2008
- IRP
Review & Comments
2007- Two Letters: 1) Jeff Mount to Michael Healey and Leslie Harder; 2) Michael Healey to Leslie Harder and Ralph Svetich (PDF: 177KB), August 30, 2007
- Letter from URS Corportation to Leslie Harder (PDF: 525KB), September 12, 2007
- Letter from Mike Healey to John Kirlin (PDF: 238KB), Septemeber 14, 2007
- Letter DWR to ISB (Mike Healey) (PDF: 392KB), September 18, 2007
- Responses to IRP comments on Risk Analysis Report (PDF: 1MB), November 2, 2007
- IRP Reply to URS Responses (PDF: 15KB), December 8, 2007
- Review of the Delta Risk Management Strategy Report, Phase 1 (PDF: 505KB), August 23, 2007
- Conference call with Bob Gilbert, Ph.D and DRMS members (PDF: 17KB), September 24, 2007
IRP Review Information
IRP Comments
- Other
Information
2007- Agenda for Public Workshop meeting
- "Business-As-Usual
(BAU) Assumptions" (PDF: 5.95MB)
- Delta Risk Strategy Management (DRMS), June 26, 2007
- DWR's
Presentation at the Public Meeting (PDF: 5.95MB)
- Delta Risk Management Strategy (DRMS), June 26, 2007
- URS
Corporation Presentation at the Public Meeting (PDF:
728KB)
- Delta Risk Management Strategy (DRMS), June 26, 2007
- Delta Risk Management Strategy, Presentation by Les Harder, Deputy Director of Public Safety and Business Operations (PDF: 6.09MB)
The Department of Water Resources held a Public Information Meeting on June 26, 2007 to discuss the Phase 1 (Risk Analysis) of the DRMS project.
The purpose of the meeting was to explain how the DRMS project was conducted and to present some preliminary findings and answer any questions the public may have on the DRMS project.
Presentations from that meeting are shown below:
