site banner
Proposition 1 IRWM Plan Review Process

Proposition 1 IRWM funding is available for projects that are included and implemented in an adopted IRWM Plan, consistent with Water Code Section 10530 et seq. The IRWM Plan Review Process (PRP) is used to provide a systematic and consistent way for DWR review IRWM plan content to determine consistency with the plan standards contained in the current IRWM Program Guidelines.

The 2016 PRP Review Tool, below, presents the 2016 IRWM Plan Standards and can also be found at the link in the 2016 IRWM Guidelines, Appendix A. Appendix H of the 2016 Proposition 1 Guidelines provides an overview of the changes between the 2016 and 2012 IRWM Plan Standards.

Contacts

Contact Phone Number Email
Project Manager Ted Daum (916) 651-9264 Theodore.Daum@water.ca.gov
Updated Proposition 1 Plan Review

The 2016 PRP review tool is available. IRWM Regional Water Management Groups can submit IRWM Plans for review on an on-going basis. Please follow the instructions in the 2016 IRWM Guidelines, Volume 2, Section IV for plan submittal.

  • Final Plan Review Process, the 2016 IRWM Guidelines [PDF] (1.1 MB)
  • Final Plan Review Process Tool [Excel] (65 KB)
Integrated Regional Water Management Plan Submittals

As IRWM plans are submitted and reviewed, they will be posted on this page for public comment. Draft reviews will be posted on the first and fifteenth of the month. When a draft review is posted, the public comment on that draft review is open and will close 30 calendar days later (date will be indicated). The link to the draft review will be removed after the public comment review period end date and a final review will be posted.

IRWM Plans and Plan Reviews per the 2016 Guidelines

IRWM Plan Plan Review Public Comment Period
End Date
Upper Feather River IRWM Plan Final Review 11/1/16
Public Comment Submittal

Public comments on a draft plan review can be submitted by the following methods:

Electronic Mail
Transmitted comments should be sent to DWR_IRWM@water.ca.gov. Electronic files should be MS Word compatible or PDF.

Hard Copy via U.S. Mail
California Department of Water Resources
Division of Integrated Regional Water Management
Financial Assistance Branch
Post Office Box 942836
Sacramento, CA 94236
Attention: Ted Daum

Hard Copy via Hand Delivery
901 P Street
Sacramento, CA 95814
Attention: Ted Daum

Please specify which plan review the comments address. Comments must be received by 5:00 pm on the public comment period closing date for the subject plan. Comments on the draft reviews will be posted on the Public Comments page.

Note: IRWM Plans and plan reviews for the Proposition 84 PRP per the 2012 Guidelines can be found on the Proposition 84 Archives page.